Madrona Playground Play Area Renovation
Updated: November 1, 2023
Fall 2023
Join Us on Saturday, November 4, from 9 a.m. to noon at the Madrona Playfield Shelter House, 3211 E Spring St, Seattle, WA 98122.
Come meet the design team, and review the design options with a presentation at 10 a.m.
We want to hear from you! Take our survey now and share your thoughts on the design options: https://seattle.surveymonkey.com/r/MadronaPlayArea
Please watch the short presentation below and review the design options to take the survey.
This project will replace the play equipment and redesign or repurpose the sandbox area to increase use. The cherry tree grove health will be examined, and improvements made as needed. Pathway paving will be upgraded to ensure an accessible route to and through the play area. This project will also include a design to provide cover for the stage.
The play area will be closed throughout construction.
Location
Madrona Playground, 3211 E Spring Street, 98122
Budget
The Seattle Park District provides $550,000 for planning, design, and construction.
Schedule
Planning: Spring 2023 - Early 2024
Design: Fall 2023 - Fall 2024
Construction: Spring 2025
Project Description
This project will replace the play equipment and redesign or repurpose the sand box area to allow more space for play equipment. Pathway paving will be selectively replaced to ensure an accessible route to and through the play area. This project will also include a design to provide cover for the stage.
Anticipated Impact: The play area will be closed throughout construction
Community Participation
Join Us on Saturday, November 4, from 9 a.m. to noon at the Madrona Playfield Shelter House, 3211 E Spring St, Seattle, WA 98122.