What's Happening Now?
The Beacon Ave S and 15th Ave S Safety Project has reached the 90% design milestone!
Here's what's new:
- 15th Ave S, 14th Ave S, and Golf Dr S intersection
- Removing the speed cushion on 15th Ave S next to the new all-way stop and instead placing a speed cushion closer to S Atlantic St
- Adding curb ramps and a new crosswalk across Golf Dr S at the northern leg of this intersection
- Relocating the bus stop from north of the intersection, on Golf Dr S, to just south of it, on 14th Ave S
- S Spokane St and Beacon Ave S
- Adding new bike signals for northbound and southbound Beacon Ave S crossing S Spokane St
- Building a raised platform that will be shared as a bus stop and bike lane on the northbound side of the road
- 15th Ave S and S Bayview St
- Adding a new curb ramps to both corners of the intersection (these streets only intersect on the east side of 15th Ave S)
- 15th Ave S between 14th Ave S and S Hill St
- Repairing pavement as early as March 2024
Thank you for joining the 90% design public meeting!
Thank you to everyone who joined our 90% design virtual public meeting on November 9! At the meeting, we highlighted what's new in the 90% design plans, shared the final parking management plan, and answered your questions in a live Q&A.
Missed the meeting? No problem.
- Watch the meeting recording below
- Scroll through the presentation slides
- Check out a summary of the live Q&A
- View the 90% design plans
For translation services, please call (206) 900-8728 and leave a message clearly stating the language you prefer.
Our crews recently installed a new all-way stop at the intersection of 14th Ave S/15th Ave S/Golf Dr. S!
We installed a temporary all-way stop at this intersection in early September this year to observe how people driving respond to this safety treatment. Our observations showed improvement in traffic calming and enhanced safety for people walking, rolling, and biking at this intersection. We moved forward with a permanent installation this week ahead of the capital project.
New all-way stop installed at the intersection of 14th Ave S/15th Ave S/Golf Dr. S.
SDOT crews installing flex posts as a part of the new all-way stop.
Background on Near-Term Safety Enhancements
Community-requested safety enhancements arrived in Beacon Hill summer 2023. Rather than waiting until the project broke ground in 2024, we installed the following treatments to calm driver speeds and make it easier to walk and roll right now! Treatments include:
- Speed cushions on 15th and 14th Aves S
- A rapid-flashing beacon at the 14th Ave S/15th Ave S/Golf Dr S intersection
- Paint-and-post curb bulbs to make crossing the street easier
- Pavement repairs
- Signs and paint where parking already isn’t allowed near intersections to make it easier for travelers see oncoming traffic
Last fall and winter, we held community site walks and listening tours to see the project area first-hand and understand the safety priorities of people living, working, and visiting the neighborhood. Along with providing a safe place for people to bike, people want traffic to slow down by their homes and businesses. And folks have said they want busier streets to be more people-oriented and easier to cross.
Map of safety enhancements in the project area. Graphic SDOT
What's Next
We have reached 60% design of the bike route and continue working on a parking management plan. Continue reading to learn more about what we learned through public engagement and how we're collecting data to inform the parking management plan.
What we heard during our recent community outreach
During our latest phase of outreach, we asked people to share their thoughts about safety needs and the bike route, particularly in the project's north segment. We gathered comments through surveys, events, meetings and listening tours, conversations, and correspondence. We received over a thousand comments from a diverse group of people living, working, and traveling in Beacon Hill. We are excited to share what we heard and are thankful for the engagement.
You can check out our early design outreach summary (2-page overview with full survey results) for a recap of our engagement activities from the past few months. It includes what we learned about your design preferences, priorities for potential improvements, and more.
You can also read on for some key themes of feedback, below:
- Protected bike lane location:
- About half of people (47%) prefer a protected bike lane on each side of 15th Ave S
- Bikes moving in the same direction as vehicles feels safer and more logical to many people. It’s a more intuitive design for people walking, biking, and driving.
- Nearly a quarter of people (22%) prefer a two-way protected bike lane only along the east side of 15th Ave S
- About half of people (47%) prefer a protected bike lane on each side of 15th Ave S
- How people travel: Folks shared they would prefer to bike (80%), walk (76%), or take public transit (68%) to get around north Beacon Hill.
- Currently, most people get around the neighborhood by either walking (71%) or driving (71%).
- Safety concerns: Unsafe driving is a big safety concern for people who weighed in. Specific concerns include speeding, cut-through traffic, and aggressive driving. People also mentioned drivers failing to yield to people walking and biking.
- Street and sidewalk conditions: Street and sidewalk maintenance was another safety concern we heard. Feedback included dim lighting, missing crosswalks, and longer crossings. Folks also shared about pavement, sidewalks, and drainage being in poor condition.
- Protected bike lane opposition: Some people shared feedback in opposition to installing the protected bike lanes. We heard people say they felt we were proposing the bike lanes for people who don’t live in Beacon Hill.
- Concerns about parking: We also heard that there are not enough people biking to warrant removing parking. There is concern about where residents without off-street parking will park their cars
- Maintaining access: Folks asked us to make sure their homes and businesses remain accessible. They need deliveries to be able to reach them.
We’re evaluating how to manage limited parking for people who live and work nearby
In summer 2022, we conducted an independent, third-party parking study for north Beacon Hill. The parking study helps us to better understand parking capacity and parking demands. The planned protected bike lanes on 15th Ave S remove about 100 on-street parking spaces. This includes 50 spaces in an existing Residential Parking Zone (RPZ). There are apartments on 15th Ave S, between Golf Dr S and S Atlantic St that currently have limited on no off-street parking.
We’ve heard concerns about loss of parking for residents who rely on their car to get to work and possible displacement. Challenges along this stretch of the street include limited space to add parking. This is primarily due to the narrow street. There is also an existing ADA-accessible parking space to accommodate and steep side streets.
Using data collected this summer and the concerns described above, we're drafting an on-street parking management plan with the residential community. This plan will be informed by the needs of the people that live in this area. The community includes Black, Indigenous, and People of Color (BIPOC) community members, multi-generational households, and people with limited on-street alternatives. The draft plan will be shared during the next phase of public engagement.
As noted above, we encourage you to stay tuned as we develop the on-street parking management plan, by signing up for email updates.
Thank you for your interest, and for sharing your perspectives to help shape this important project. Let's continue to work together to create a safe and comfortable bike route through southeast Seattle that connects people to businesses and community destinations in Beacon Hill.
Here’s how you can reach us and stay informed:
- Sign up for email updates
- Call us: (206) 900-8728
- Email us: Beacon15thSafety@seattle.gov
.
Project Description
We are building the project in segments, from the Dr. Jose Rizal Bridge to the intersection of Beacon Ave S and 39th Ave S.
- North Segment extends from the Dr. Jose Rizal Bridge to S Spokane St.
- Middle Segment is between S Spokane St to S Myrtle St.
- South Segment completes the route to 39th Ave S.
Project Overview
In 2019, SDOT partnered with the Department of Neighborhoods (DON) to conduct outreach around the City to find out about the community's priorities to having places to bike in their community. This outreach effort provided an avenue to listen to community members, understand how the implementation plan was perceived, and collect ideas on how we could improve the plan. We also learned about how future work can be more responsive to community needs. We heard clearly that it was important to have more routes in Southeast Seattle to connect people to the neighborhood and job centers, specifically on Beacon Hill. The Beacon Hill Bike Route Project was created in response to what we heard. The purpose of this project is to create a safe and comfortable bike route that connects people to businesses and community destinations in Beacon Hill. This bike project continues to build out the bike network connecting to the new bike lanes on S Columbian Way, S Myrtle St, and the Chief Sealth Trail. We're planning a bike route in Beacon Hill as we've identified the area as a high-priority corridor for meeting the following transportation and community needs:
- This project will contribute to the City's Vision Zero goal to end traffic deaths and serious injuries.
- Provide a better north/south bike connection in southeast Seattle.
- Improve pedestrian and bicycle safety and connections to transit.
Though there are other existing bike routes nearby, these other routes do not connect to the same vital community destinations.
Project Schedule
Project Details
North Segment
The North Segment extends from Dr. Jose Rizal Bridge to S Spokane St and connects the North Beacon Hill neighborhood.
Cross Sections
15th Ave S One-Way Protected Bike Lane
- Parking available on west side of Golf Dr S
- Metro's Routes 36 and 60 shared bus stop relocated from Golf Dr S to 14th Ave S
- Parking available on east side between S College St and S Bayview St
- New bike turn queue box with No Turn On Red on north leg of Beacon Ave S and 15th Ave S intersection
Beacon Ave S One-Way Protected Bike Lanes
- Parking and load zones available on both sides of Beacon Ave S
- except between S Lander St and S McClellan St (Beacon Hill Light Rail station and Metro bus stop)
- New curb ramps identified along the corridor
- Bike lane and bus stop options at Beacon Hill Light Rail Station/Metro bus stop for Routes 36, 60, and 107
- Raised bike lane with In-Lane Bus Stop
- Bike lane behind bus stop, in front of existing street trees
- Raised Bike Lane with In-Lane Bus Stop
Community Points of Interest
Middle Segment
The Middle Segment is located along Beacon Ave S from S Spokane St to S Myrtle St. It goes by Jefferson Park and connects along the center median trail through central Beacon Hill.
Community Points of Interest
Typical S Spokane St to S Alaska St
Proposed S Spokane St to S Alaska St
Note: cross sections are not to scale.
South Segment
The South Segment will be between S Myrtle St and S 39th St in South Beacon Hill. This area is much more residential.
Community Points of Interest
Typical S Ferdinand St to S 39th St
Proposed S Ferdinand St to S 39th St
Note: cross sections are not to scale.
Community Engagement
Since the summer of 2020, we have conducted multiple community engagement events with people who live and travel through Beacon Hill. The extensive feedback about route preferences and design features helped to inform the northern route segment. Read our Planning Outreach Summary report to learn more about the process and feedback received for this project.
During the planning, design, and construction phases of our project, we conduct inclusive community engagement and strive to balance varying needs presented by public comments that we receive at each step of our outreach processes. The below table summarizes our upcoming outreach activities.
- Fall/Winter 2022/23: Early Design outreach activities -- gather community feedback for the North Segment early design alternatives and intersection options
- Winter 2021/2022: North Beacon Hill business district - gather feedback about access and parking needs
- Summer 2021: Neighborhood and public meetings - gather community feedback and ideas about about the use of this busy corridor
- November 2020: Online drop-in session - share the Middle and South Segments options, answer questions and gather feedback from the community
- August 2020: Online drop-in session - introduce the project, share the North Segment route options, answer questions and gather feedback from the community
- Ongoing: Business outreach - discuss project impacts, provide project information and updates and gather feedback
- Ongoing: Stakeholder outreach - provide project updates and gather community feedback
- Ongoing: Email updates - project updates
Bike Network Prioritization Process
The Beacon Hill Bike Route project was prioritized based on public feedback and City Council actions over the past several years. In 2019, SDOT and DON held four community meetings across the city to learn about people's priorities for building out the bike network. In that outreach, as well as engagement with the Seattle Bicycle Advisory Board, it was strongly recommended to build a bike connection not only on 12th Ave S between Capitol Hill and Beacon Hill, but within Beacon Hill itself to create a greater connection between southeast Seattle and downtown.
Beacon Hill was specifically recognized during that outreach as a priority of community and transportation safety advocates (see pages 13-14 of the 2019 Bicycle Master Plan Implementation Plan for summaries.) In addition, during the 2019 budget process, the City Council allocated funding to prioritize building a bike connection in southeast Seattle.
Funding
The Mayor's Office committed an additional $10.33M from the Mercer Megablock sale to building bike facilities prioritized by the community, including a connection Beacon Hill to Downtown. This project will be partially funded by the 9-year Levy to Move Seattle, approved by voters in 2015. Learn more about the Levy to Move Seattle.
Materials
To view a PDF of project-related materials, please click on the links provided below.
- 90% design milestone presentation (November 2023)
- 60% design milestone presentation (August 2023)
- Video of recorded 30% design milestone virtual public meeting (May 10, 2023)
- Video of recorded virtual public meeting (March 2, 2023)
- 15th Ave S Parking Study (Summer 2022)
- North Segment: Early Design Outreach Summary Report with Survey Feedback
- North Segment: 10% Design Cross Sections:
- North 1: 10% Design Plan Sets:
- 15th Ave S Route Announcement Presentation
- 15th Ave S Route Announcement Mailer
- 15th Ave S Route Announcement Poster
- 2020-2021 Outreach Summary Report
- Summer 2021 North Beacon Hill Outreach Invite Mailer
- Summer 2021 North Beacon Hill Outreach Poster
- 15th Ave S Neighbors 2021 Site Walk and Focus Group Flyer
- 15th Ave S Neighbors 2021 Outreach Invite Flyer
- November 2020 Outreach Summary
- November 2020 Drop-in Session Q&A
- October 2020 Middle and South Segments Early Planning Drop-in Session Invite Postcard
- August 2020 Outreach Summary
- August 2020 Drop-in Session Q&A
- July 2020 Early Planning Drop-in Session Invite Mailer
- Project Fact Sheet (English)
- Project Fact Sheet (Spanish)
- Project Fact Sheet (Simplified Chinese)
- Project Fact Sheet (Traditional Chinese)
- Project Fact Sheet (Tagalog)
- Project Fact Sheet (Vietnamese)
- Project Map (All Segments)
- North Segment Map
- Middle Segment Map
- South Segment Map